GE faces tougher dredging standards

ALBANY — General Electric must remove more PCB-tainted sediment from the Hudson River and will have to take better samples of the river bottom when it resumes dredging in the spring, the U.S. Environmental Protection Agency said Friday

Read On: http://www.poughkeepsiejournal.com/article/20101218/NEWS/12180342/GE-faces-tougher-dredging-standards